Search Criteria

 






Key Word Search by:









Organization Type


State or Jurisdiction


Congressional District





help

Division or Office
help

Grants to:


Date Range Start


Date Range End


  • Special Searches




    Product Type


    Media Coverage Type








 


Search Results

Grant number like: PF-50269-12

Permalink for this Search

1
Page size:
 1 items in 1 pages
Award Number Grant ProgramAward RecipientProject TitleAward PeriodApproved Award Total
1
Page size:
 1 items in 1 pages
PF-50269-12Preservation and Access: Sustaining Cultural Heritage CollectionsColonial Williamsburg FoundationEvaluation of Mechanical and Control Systems Serving the Art Museums at Colonial Williamsburg10/1/2012 - 2/28/2014$50,000.00PatriciaAnneSilence   Colonial Williamsburg FoundationWilliamsburgVA23185-4138USA2012Archival Management and ConservationSustaining Cultural Heritage CollectionsPreservation and Access500000500000

A planning project to evaluate climate control and lighting systems in the DeWitt Wallace Decorative Arts Museum and the Abby Aldrich Rockefeller Folk Art Museum, which house collections of fine and decorative art objects made or used in America or Great Britain between 1680 and 1830, and folk art holdings of paintings, sculpture, carvings, textiles, and pottery crafted by minimally trained and untrained American artists between the early 18th century and the present. The aim of the project is to identify the best methods to meet preservation goals, while doing so in energy-efficient and cost-effective ways.

This NEH planning grant would be used to evaluate mechanical and control systems serving the DeWitt Wallace Decorative Arts Museum and the Abby Aldrich Rockefeller Folk Art Museum, with the goals of a) developing a plan to replace and upgrade systems and thereby improve reliability, performance and efficiency, and b) creating and sustaining a safer environment for the Colonial Williamsburg collections. Targeted areas include evaluation of: 1) the condition and performance of mechanical equipment, especially the 1984 air handlers and heating plant; 2) the condition and performance of the chiller plant, including assessment of plate heat exchanger fouling of modular chillers used with open tower condensing loop; 3) optimum control strategies and BAS programming to maintain museum environmental conditions with minimal energy use; 4) existing BAS operations and maintenance support; 5) lighting upgrade options to reduce energy usage and light exposure to the collections.