Pilgrim Hall Museum (Plymouth, MA 02360) Peggy M. Baker (Project Director: November 2005 to February 2010) Ann Berry (Project Director: February 2010 to March 2010)
CH-50351-07
Challenge Grants
Challenge Programs
|
Totals (matching):
$300,000 (approved) $300,000 (offered) $300,000 (awarded)
Grant period:
6/1/2004 – 1/31/2011
|
The Campaign for Pilgrim Hall Museum
Construction of a new addition, installation of air-conditioning and climate control systems, and installation of an elevator, new entry portico, and ramp.
The Pilgrim Society and Pilgrim Hall Museum seek a National Endowment for the Humanities Challenge Grant of $300,000 to support construction of a new 3,600 foot addition that will house a gallery for changing exhibitions; to install air conditioning in the existing 181-year-old struture as well as the newly constructed wing and to install climate control systems in archival storage areas; to make the facility fully accessible to those with disabilities by installing an elevator, constructing a new entry portico and ramp and preparing pathways and parking spaces through modifications to our site.
|